List of water treatment companies and usage of SBR Technology.
If you scan through the list of water treatment companies in Philippines a good amount of companies is using SBR for their water treatment process. Sequencing batch reactor (SBR) is a fill-and draw activated sludge system for wastewater treatment. In this system, wastewater is added to a single “batch” reactor, treated to remove undesirable components, and then discharged. Equalization, aeration, and clarification can all be achieved using a single batch reactor. To optimize the performance of the system, two or more batch reactors are used in a predetermined sequence of operations. SBR systems have been successfully used to treat both municipal and industrial wastewater. They are uniquely suited for wastewater treatment applications characterized by low or intermittent flow conditions.
list of water treatment companies and description of a wastewater treatment Plant Using an SBR
The operation of an SBR is based on a fill-and-draw principle, which consists of five steps—fill, react, settle, decant, and idle. These steps can be altered for different operational applications.
Fill
During the fill phase, the basin receives influent wastewater. The influent brings food to the microbes in the activated sludge, creating an environment for biochemical reactions to take place. Mixing and aeration can be varied during the fill phase to create the following three different scenarios:
Static Fill – Under a static-fill scenario, there is no mixing or aeration while the influent wastewater is entering the tank. Static fill is used during the initial start-up phase of a facility, at plants that do not need to nitrify or denitrify, and during low flow periods to save power. Because the mixers and aerators remain off, this scenario has an energy-savings component.
Mixed Fill – Under a mixed-fill scenario, mechanical mixers are active, but the aerators remain off. The mixing action produces a uniform blend of influent wastewater and biomass. Because there is no aeration, an anoxic condition is present, which promotes denitrification. Anaerobic conditions can also be achieved during the mixed-fill phase. Under anaerobic conditions the biomass undergoes a release of phosphorous. This release is reabsorbed by the biomass once aerobic conditions are reestablished. This phosphorous release will not happen with anoxic conditions.
Aerated Fill – Under an aerated-fill scenario, both the aerators and the mechanical mixing unit are activated. The contents of the basin are aerated to convert the anoxic or anaerobic zone over to an aerobic zone. No adjustments to the aerated-fill cycle are needed to reduce organics and achieve nitrification. However, to achieve denitrification, it is necessary to switch the oxygen off to promote anoxic conditions for denitrification. By switching the oxygen on and off during this phase with the blowers, oxic and anoxic conditions are created, allowing for nitrification and denitrification. Dissolved oxygen (DO) should be monitored during this phase so it does not go over 0.2 mg/L. This ensures that an anoxic condition will occur during the idle phase. This has been certified by majority of companied in the list of water treatment companies.
React
This phase allows for further reduction or “polishing” of wastewater parameters. During this phase, no wastewater enters the basin and the mechanical mixing and aeration units are on. Because there are no additional volume and organic loadings, the rate of organic removal increases dramatically. Most of the carbonaceous BOD removal occurs in the react phase. Further nitrification occurs by allowing the mixing and aeration to continue—the majority of denitrification takes place in the mixed-fill phase. The phosphorus released during mixed fill, plus some additional phosphorus, is taken up during the react phase. The list of water treatment companies who follow this process is included our next blog.
Settle
During this phase, activated sludge is allowed to settle under quiescent conditions—no flow enters the basin and no aeration and mixing takes place. The activated sludge tends to settle as a flocculent mass, forming a distinctive interface with the clear supernatant. The sludge mass is called the sludge blanket. This phase is a critical part of the cycle, because if the solids do not settle rapidly, some sludge can be drawn off during the subsequent decant phase and thereby degrade effluent quality.
Decant
During this phase, a decanter is used to remove the clear supernatant effluent. Once the settle phase is complete, a signal is sent to the decanter to initiate the opening of an effluent-discharge valve. There are floating and fixed-arm decanters. Floating decanters maintain the inlet orifice slightly below the water surface to minimize the removal of solids in the effluent removed during the decant phase. Floating decanters offer the operator flexibility to vary fill and draw volumes. Fixed-arm decanters are less expensive and can be designed to allow the operator to lower or raise the level of the decanter. It is optimal that the decanted volume is the same as the volume that enters the basin during the fill phase. It is also important that no surface foam or scum is decanted. The vertical distance from the decanter to the bottom of the tank should be maximized to avoid disturbing the settled biomass.
Idle
This step occurs between the decant and the fill phases. The time varies, based on the influent flow rate and the operating strategy. During this phase, a small amount of activated sludge at the bottom of the SBR basin is pumped out—a process called wasting.
ADVANTAGES AND DISADVANTAGES
Some advantages and disadvantages of SBRs are listed below by the list of water treatment companies are as follows after our survey.
Advantages
Equalization, primary clarification (in most cases), biological treatment, and secondary clarification can be achieved in a single reactor vessel.
Operating flexibility and control.
Minimal footprint.
Potential capital cost savings by eliminating clarifiers and other equipment.
Disadvantages
A higher level of sophistication is required (compared to conventional systems), especially for larger systems, of timing units and controls.
Higher level of maintenance (compared to conventional systems) associated with more sophisticated controls, automated switches, and automated valves.
Potential of discharging floating or settled sludge during the DRAW or decant phase with some SBR configurations.
Potential plugging of aeration devices during selected operating cycles, depending on the aeration system used by the manufacturer.
Potential requirement for equalization after the SBR, depending on the downstream processes.